Munday, 2nd September 2019

I can only commend the way these works were carried out. The engineer (Rhys) arrived on time and gave me a detailed report of how the new boiler would be installed. The works were carried out to a very high standard and I was impressed with the engineer. When the installation was completed there was a problem with the supply from the oil tank, nothing to do with their works I hasten to add, but a new valve was brought on site and fitted so the boiler could be fired up. Excellent work.

Previous Post
Southward, 23rd August 2019

Related Posts

No results found.

Menu