Monday, 2nd September 2019

I can only commend the way these works were carried out. The engineer (Rhys) arrived on time and gave me a detailed report of how the new boiler would be installed. The works were carried out to a very high standard and I was impressed with the engineer. When the installation was completed there was a problem with the supply from the oil tank, nothing to do with their works I hasten to add, but a new valve was brought on site and fitted so the boiler could be fired up. Excellent work.

Previous Post
Southward, 23rd August 2019
Next Post
21 October 2021

Related Posts

No results found.

Menu